TCC – Transmission Completion Certificate Issued when construction and installation of the transmission line are completed and the line is ready for testing/commissioning.
PAC – Provisional Acceptance Certificate Issued after initial testing, commissioning, and energization, confirming the line is operational with minor pending items.
FAC – Final Acceptance Certificate Issued after all punch-list items are closed and final documentation is submitted; marks full handover to the client.
NFOC – Non-metallic Fiber Optic Cable Underground fiber cable used inside substations or along routes.
SCADA – Supervisory Control and Data Acquisition System for monitoring and controlling the power network.
BSP – Bulk Supply Point High-voltage substation connecting transmission to distribution or generation.
LILO – Loop-In Loop-Out Method of connecting a new substation by looping an existing transmission line through it.
🔹 Structural & Civil Engineering
GA Drawing – General Arrangement Drawing Shows overall layout and configuration of towers, gantries, or foundations.
GIS – Geographic Information System Used for mapping, route selection, and land data.
🔹 Software & Tools
PLS-CADD – Power Line Systems – Computer Aided Design and Drafting Specialized software for transmission line design, sag & tension, and Plan & Profile generation.
STAAD – Structural Analysis and Design Software used for tower and foundation structural analysis.
ETABS – Extended Three-Dimensional Analysis of Building Systems Structural analysis software (sometimes used for gantries or substations).
SAP2000 – Structural Analysis Program 2000 Advanced structural analysis software.
ZWCAD – ZWSOFT Computer-Aided Design CAD software used for drafting drawings.
AutoCAD – Automatic Computer-Aided Design Drafting and drawing software.
MicroStation – (Brand name, not an abbreviation) CAD software widely used for infrastructure projects.
🔹 Documentation & Management
O&M – Operation and Maintenance Manuals handed over at FAC stage.